Reamlet

Templates for paper tablets

A notebook that already knows your work.

Hyperlinked planners and notebooks for reMarkable, Kindle Scribe, Supernote and Boox. Each one is built for a single kind of work, and redrawn for every device at its own resolution.

49Templates
9Device editions
0Subscriptions
The Meeting Notes System on a paper tablet
Meeting Notes System, reMarkable 2 edition

01Find yours

Where do you write?

Every template here was built for one kind of work. Say where you do yours and the right one comes forward.

02The collection

Arranged by the work, not by the format.

Every template is a hyperlinked PDF in nine device editions, right- and left-handed, in mono and in colour. One purchase covers all of them.

  1. 01 At workMeetings, delivery, campaigns, reviews, and the money that follows Meeting Notes System, Managers Pack, Project Planner, Freelancers Ledger, Marketers Book, Owners Book, Solo Creator Planner, Review Season, Job Search Book 9
  2. 02 DesignScreens, print, the camera, and the paper around all three Design Practice, UI Sketchbook, Graphic Design Book, Photographers Book 4
  3. 03 On site and in the labWhere the record has to hold up later Field Engineers Set, Contractors Job Book, Research Journal 3
  4. 04 In practiceClinical, legal, pastoral and private practice Clinical Shift System, Legal Pad Pro, Practice Notes, Sermon and Pastoral 4
  5. 05 Teaching and studyClasses, courses, pupils, languages and the eight weeks before an exam Teachers Planner, Student System, Language Notebook, Music Teachers Book, Exam Season 5
  6. 06 MakingWriting, playing, reading, knitting, family history, and running a table Writers Room, Musicians Book, Reading Journal, Knitters and Makers, Family History, Game Masters Codex 6
  7. 07 Every dayPlanners, a journal, and one for a difficult day Daily Planner 2026-2027, Undated Weekly System, Journal, ADHD Daily 4
  8. 08 At homeThe kitchen, the money, the house, the garden and the training Recipe Book, Budget Log, Household Binder, Garden Year, Training Log, Spring Clean 6
  9. 09 AwayA trip, and the season around a set of races Travel Planner, Race Season 2
  10. 10 Times of yearThe six weeks that come round every year and are never the same twice December Book, New Year Reset, Tax Season Folder, Back to School, Summer With Kids 5
  11. 11 PaperThirty writing surfaces, ruled true Note Styles Pack 1

See the whole collection →

03The problem

Most templates were made for paper, then squeezed onto a screen.

Shrink an A4 page down to a 1404-pixel screen and its lines stop landing on whole pixels. One draws at two pixels, the next at three. E-ink has no backlight to hide behind, so you see every one of them.

The same ruled page, squeezed to fit and drawn for the screen, magnified
Magnified 7× The same ruling. Left, squeezed to fit. Right, drawn for the screen.

04How they're drawn

Four rules, and every file is held to them.

Rule 01

Drawn at your screen's real size.

Every line sits on a whole pixel of your device, so a two-pixel rule draws as two solid pixels instead of three faint ones. The reMarkable 2 file was made for a reMarkable 2. It was not stretched down from something else.

The same ruling, squeezed and drawn
Fig. 01 The same ruling, squeezed and drawn

Rule 02

Six millimetres is six millimetres.

Ruling is measured in real millimetres on every device: at 226 pixels per inch and at 300, on a ten-inch screen and on a pocket one. The paper you picked is the paper you get.

A timesheet, and the tenths chart printed on it
Fig. 02 A timesheet, and the tenths chart printed on it

Rule 03

No number you might disagree with.

No clinical threshold, allowable stress, tax rate or tempo marking is printed anywhere. Those belong to your protocol, your code edition and your jurisdiction. The column is there; the number is yours.

A calculation sheet, every criterion column left blank
Fig. 03 A calculation sheet, every criterion column left blank

Rule 04

Written with people who do the job.

Rehearsal letters skip I, J and O. Drawing revisions skip six more. Ten minutes is a sixth of an hour, not a tenth. Every template carries the detail that tells its owner who it was really made for.

A cut sheet, named by bar and letter together
Fig. 04 A cut sheet, named by bar and letter together

05What's checked

Every file is tested before it ships.

Geometry, links, tap targets, line weight at your device's real resolution, colour against the mono edition, page count, download size. One failed check and the file does not go out.

Every page

Nothing stranded, nothing dead, nothing too small to tap.

The test reads the finished PDF rather than the code that made it, so what gets checked is exactly what you download. Left-handed editions are redrawn rather than mirrored: the schedule column and its hour labels move across, so your hand rests on blank page instead of on what you are reading.

The Daily Planner on a paper tablet
Nine editions. One purchase covers every device.
The Freelancer's Ledger on a paper tablet

06What you get

Buy it once. Every device, and every fix.

Your purchase covers all nine device editions, not only the one you own today: change tablets and your files are already waiting. Find a mistake and tell me the device and the page — the corrected file appears on your download page, for as long as the template exists.

No account  ·  No subscription  ·  Nothing to sign into

  • reMarkable 2
  • reMarkable Paper Pro
  • reMarkable Paper Pro Move
  • Kindle Scribe
  • Kindle Scribe Colorsoft
  • Supernote Manta
  • Boox Note Air
  • A4 Print
  • US Letter Print

Browse the collection →

Good paper disappears.

You should be thinking about the work, not the page.

Find the one that fits your work →